Technology
Patents
Design
Productive cycle
  • Raw material check
  • Materials cut
  • Upper hemming
  • Assembly of the bottom
  • Finishing


  • Home


    Technology - Productive cycle

  • Raw material check


  • All materials used for production are subject to control tests for being accepted into the warehouse. This control is carried out directly in the plant laboratories through modern electronic or electromechanical equipment to guarantee they are compliant with the physical requirements as well as by means of chemical assays, carried out in specialised laboratories, aimed at controlling the absence of noxious substances not allowed by the community standards.

    << Back

    Site policy
    ©2004 Imac -All rights reserved. Web by e.Dexter.